This time, we are going to replace the master cyl and the brake lines. Considering the unknown state of the master cyl, decided to replace it rather than overhauling it. Thank you to continuous support from Goodridge for the custom made brake lines using the NSXCB special parts no.. Details are covered in here; ...
Lowered the chassis to the ground and torqued the spindle nut to the spec. Then, using the drive shaft chisel, staked the spindle nut to lock it. Suspension area bolts and nuts torqued under 1G in preparation to visit the alignment platform next week. Drive shaft service done and moving onto the brake area. ...
[Edit: CV Boot band installation TSB98-018Driveshaft.pdf] In case someone worked on the drive shaft in the past, double check the tripod offset between the inboard and outboard joints. There should be 60deg offset as you can see above. ...
Updated 14-03-2012 at 12:41 AM by Kaz-kzukNA1 (Attached CV Boot Band installation procedure pdf file.)
Started to overhaul the drive shaft. Cleaned the joint housing to this level for inspection. The roller, tripod/spider, housing, shaft are specially heat treated and hardened several times so you must place each parts in their original direction/position on reassembly. The original grease was already ...
In January, I received an email from Honda regarding the display of NSX Concept model at the Headquarters showroom in Aoyama, Tokyo, Japan on the first weekend of February. Although I couldn’t make it, there were lots of video clips posted on YouTube. One example; Not much point in discussing about the detail of the design ...