View RSS Feed

All Blog Entries

  1. Eng Refresh Stage 2 - 21

    by , 03-02-2012 at 10:38 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Due to other projects being very busy, couldn’t spend much time on my NSX but now back in the garage again.




    Oil Pan removed and if you have the replacement o-ring, you can also remove the oil screen/strainer to completely take off the baffle plate.

    I didn’t have one so just shifted the baffle to take a quick
    ...

    Updated 02-06-2012 at 01:55 PM by Kaz-kzukNA1

    Categories
    Engine Refresh Stage 2
  2. A/C CCU Board Service A & B - 04

    by , 03-02-2012 at 10:37 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Finally, all of the electrical components were back in place on my NSX so managed to re-connect the battery.

    Although I can’t start the engine yet, decided to check the two CCU boards.





    One of the board on my NSX. The Lot # will tell which one.




    ...

    Updated 06-02-2012 at 10:03 AM by Kaz-kzukNA1 (Corrected the sensor input info.)

    Categories
    A/C CCU Board Service
  3. Eng Refresh Stage 2 - 20

    by , 31-01-2012 at 10:37 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)






    Eng is back on the chassis.

    Not much to say because it’s just the matter of lots and lots of wrenching putting everything back in place.

    Just kept all four eng/trans mount and twelve rear sub frame bolts loose as I still need to remove the Front beam to re-install the A/C compressor as well as to remove
    ...

    Updated 01-06-2012 at 11:09 PM by Kaz-kzukNA1

    Tags: eng loom Add / Edit Tags
    Categories
    Engine Refresh Stage 2
  4. A/C CCU Board Service B – 03

    by , 30-01-2012 at 10:06 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    Time to work on the other board.
    This one required lots of time for the service work.




    Used so many hard wires to re-create the missing tracks and pads.
    It’s not easy to imagine the actual size from this photo but just for this area, there are three hard wires used. The diameter is in the order of 0.5mm.
    ...
  5. A/C CCU Board Service A – 03

    by , 30-01-2012 at 10:05 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)










    Rebuilt the dissolved GND plains and strengthen surrounding tracks and pads against the noise.
    ...