View RSS Feed

Recent Blogs Posts

  1. Eng Refresh, Health Check, etc 22

    by , 02-09-2019 at 10:01 AM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)








    Just finished the 49th day ceremony over the weekend back in Japan.
    Now we can bury the ashes in the grave.
    Lived too long outside of Japan and for us, it was first time experience so everyday leant something new since July.
    R.I.P.



    Now back to Eng Refresh.






    ...

    Updated 02-09-2019 at 10:04 AM by Kaz-kzukNA1

    Categories
    Eng Refresh Stage 1 + LMA
  2. Final Touch 01

    by , 05-02-2014 at 03:42 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)








    Everything back in place, pressure bled the brake system,
    staked the spindle nut and kept the car on the
    ...
  3. Eng Refresh 15

    by , 15-01-2014 at 11:08 AM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)






    The VTEC spool valve installed with 2 new gaskets and 6 new bolts at each bank.
    Later spec smaller diameter solenoid model so P08 version used.



    ...
  4. Eng Refresh 15

    by , 26-10-2013 at 10:15 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)






    Long hours marathon session of valve clearance adjustment started.

    The clearance and the torque checked twice for each cyl and
    as my standard procedure, they were checked one more time to bring
    all 24 adjustments
    ...
  5. Final Touch 01

    by , 26-09-2013 at 10:17 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)





    Installed the passenger foot well and door speaker boxes.
    Be gentle will all of the fixing tabs at the speaker box as well as at the door card.




    Whenever you have a chance to access the 3pin connector behind
    ...
Page 1 of 3 123 LastLast